TECHNICAL DATA SHEET FOR SCISSOR LIFT
|
|
Purpose / Usage:
|
Shed lightings Repairing at 12mtr height
|
|
Quantity:
|
01 nos
|
|
S.no
|
Parameters
|
Punj Lloyd Requirements
|
Supplier Comments/ specs.
|
|
1
|
Model
|
Model to mention
|
P123012.5TDC
|
|
2
|
Maximum Height of Platform Top
|
12 mtrs.
|
OK
|
|
3
|
Collapsed Plat Form Height
|
Max. 1800 mm
|
OK
|
|
4
|
Carrying Load capacity upto 12mtrs.
|
500 Kgs
|
OK
|
|
5
|
Overall Length(Front to back)
|
2.8m
|
3100mm Length
|
|
6
|
Overall Width(Left to right)
|
1.2m
|
1300mm
|
|
7
|
Platform side railing height.
|
max. 1200mm from platform top
|
1100mm
|
|
8
|
Travel Speed
|
10km/h(variable)
|
3 - 4 KM / hr.
|
|
9
|
Plat Form Size(L X W)
|
m
|
3000mm x 1200mm
|
|
10
|
Ground Clearance
|
mm
|
100mm
|
|
11
|
Turning Radius
|
mm
|
@5.5 Mtr.
|
|
12
|
Lift Speed
|
mm/sec
|
56mm / Sec.
|
|
13
|
Lowering speed
|
mm/sec
|
56mm / Sec.
|
|
14
|
Scissor Lifting Mechanism Type (Up & Down)
|
Battery operated
|
OK
|
|
15
|
Battaries capacity
|
V/Ah
|
24V DC 220 Amps/hr.
|
|
16
|
Type Of Battery
|
|
Deep Cycle Traction battery
|
|
17
|
Life Of Battery
|
|
3 Years
|
|
18
|
Battery Make
|
|
Microtex
|
|
19
|
Battery Charging Time from Fully discharge condition to Fully Charge Condition
|
|
|
|
20
|
Integrated Charger with cable
|
V/Ah
|
220v / 24 V DC 30 Amps/hr.
|
|
21
|
Scissor Lift Travel(Forward & Backward)
|
1) Manual pushing on wheels 2) Battery operated
|
OK
|
|
22
|
Scissor Lift Drive Motor specification
|
|
2.2 KW - 24V DC 220 Amps/hr.
|
|
23
|
Gradeability
|
%
|
N/a
|
|
24
|
Tyre Details (Dimensions)
|
Solid Tyres
|
PU mouled wheels 560mm OD x 150mmwitdh non marking
|
|
25
|
Total weight of scissor lift
|
Kgs
|
|
|
26
|
Colour of Equipment
|
Traffic Yellow(RAL-1 023)
|
Racing blue and golden yellow with blackstripes
|
|
27
|
Parking brake lamp
|
|
N/a
|
|
28
|
Operation lamp
|
|
OK
|
|
29
|
Location of Operatong Panel
|
|
Control push button will be provided on top platform and bottom frame
|
|
30
|
Set of Ligths
|
|
|
|
31
|
|
Beeper will be provided.
|
|
32
|
Brakes
|
|
All Four Corners of base structure will be provided with retraceable type extension
beam and screw jack for stability while working
|
|
33
|
Stop & tail lights
|
|
N/a
|
|
34
|
Warranty Period
|
To mention from date ofcommissioning
|
Two years on structural components One year on Hydraulic components
|
|
35
|
No. of free servicing visits during warranty period.
|
To mention
|
|
|
36
|
Delivery-within 04 weeks at PLL Gwaliorsite. (Must requirement)
|
within 04 weeks.
|
1 0 weeks to 1 2 weeks from the date of receipt of your confirmed order
|
|
37
|
Std tool kit
|
Must requirement
|
Supplied along with equipment
|
|
38
|
Annual maintenance Cost(Rs)/Annumafter 1 st year.
|
cost to mention
|
|
|
39
|
No. of Visit for P.M /year
|
cost to mention
|
|
|
40
|
No. of Mandays per visit for P.M
|
cost to mention
|
|
|
41
|
No. of visits for Breakdown calls/year
|
cost to mention
|
|
|
42
|
After sales service office at Gwalior or nearby Gwalior
|
cost to mention
|
|
|
43
|
Spare parts availability(To provide list)
|
cost to mention
|
|
|
44
|
No. of service engineers available
|
cost to mention
|
|
|
45
|
No. of service Technicians available
|
cost to mention
|
|
|
46
|
List of spares required in 1st yearincluding oils(to attach alongwith)
|
cost to mention
|
|
|
47
|
Cost of 1st year spares(Rs)
|
cost to mention
|
|
|
48
|
Unloading of equipment at PLL -site
|
supplier scope
|
not our scope of supply
|
|
49
|
Commissioning of equipment at site
|
supplier scope
|
Charged extra
|
|
50
|
Safety Features
|
Supplier to mention any additional safety available in the equipment.
|
|